Power Logging & Maximum Demand Studies Sydney

Real, measured load data — not guesswork — before you commit to a supply upgrade, an EV charger install, or respond to a distributor.

‍
Before spending on a bigger supply, a three-phase conversion or an EV charging setup, it pays to know what your property or business is actually drawing. High Demand Electrical installs data loggers on your switchboard, records real demand over a representative period, and analyses it against the AS/NZS 3000 maximum demand tables — giving you an evidence-based answer instead of an assumption.
Over 300 - 5 star reviews!
Get Your Free Instant Quote Now

We promise to get back to you within 10 minutes

Max file size 10MB.
Uploading...
fileuploaded.jpg
Upload failed. Max size for files is 10 MB.
Thanks! Your enquiry has been received and one of our Level 2 electricians will be in touch soon. Need urgent help right now? Call us on 0402 559 777.
Oops! Something went wrong and your enquiry was not submitted. Please try again, or call us directly on 0402 559 777 and we will help right away.
New Electrical Connections

AS/NZS 3000 Maximum Demand Tables

AS/NZS 3000 Appendix C sets out the standard method for calculating maximum demand — the tables and diversity factors used to estimate the peak load a supply needs to carry. Logged data either confirms that calculation or reveals where real-world use differs from the theoretical figure, which matters most when planning a switchboard upgrade, a three-phase conversion, or responding to a commercial electrical compliance requirement.

If you just need a quick theoretical figure rather than a logged study, start with our free maximum demand calculator before booking a full power logging job.
High Demand Electrical service truck at a residential job site
Quick Answer

What Is Power Logging and a Maximum Demand Study? Measuring actual electrical demand, then checking it against AS/NZS 3000 to see if your supply is really adequate. Power logging installs a data logger on your switchboard to record actual current, voltage and demand over time, usually a week. A maximum demand study is the analysis that follows — comparing that logged data (or a calculated estimate) against AS/NZS 3000's maximum demand tables to determine whether your existing supply genuinely has capacity to spare, or whether an upgrade is actually needed.

New Electrical Connections

Common Reasons To Log Power and Study Maximum Demand

Most people only think about actual demand once someone asks them to prove it.
1

Planning a supply upgrade

Confirming genuine demand before paying for a 200A, 400A or three-phase upgrade you may not fully need.
2

EV charger & equipment feasibility

Checking whether existing capacity can absorb a new EV charger, HVAC plant or major appliance before installing it.
3

Compliance & defect responses

Providing measured evidence when a distributor or compliance report questions your load.
4

Disputed capacity assessments

Backing up a case with real data rather than a theoretical calculation alone.
For a quick theoretical estimate rather than a full logged study, our free maximum demand calculator applies the AS/NZS 3000 tables directly — useful for a first pass before deciding whether a full study is worthwhile.
New Electrical Connections

How High Demand Electrical Runs a Power Logging Study

1

Site Assessment & Logger Install

We install a certified data logger on your switchboard, sized to capture every relevant circuit or the main supply as needed.
2

Logging Period

The logger records current, voltage and demand continuously, typically for 7 days to capture a full weekly load cycle including weekends.
3

Analysis Against AS/NZS 3000

The logged data is compared against the maximum demand tables in AS/NZS 3000 Appendix C to assess actual versus theoretical capacity.
4

Report & Recommendation

You receive the raw logged data plus a written report with a clear recommendation — upgrade, no upgrade needed, or further investigation.
New Electrical Connections

Which Study Fits Your Situation

Quickest option

Quick Load Check

A theoretical first pass using AS/NZS 3000 tables, no logger installed.
Most Common

Standard 7-Day Power Log

A full week of logged, measured data covering weekday and weekend load.
  • Certified data logger installed on site
  • Written report with recommendation
  • Suits most homes & small businesses
Most thorough

Extended Seasonal Study

Pole, pillar and connection point all move — typically for a rebuild or major site change.
  • Captures genuine peak periods
  • Suits commercial & industrial sites
  • Strongest evidence for distributor disputes
Fully Licensed

Our Energy Providers

Authorised by Sydney's major networks

Strata Main Switchboard and Consumer Mains

What’s Included in a Power Logging & Maximum Demand Study

1

Site Assessment

Confirming which circuits or supply points need logging before installing anything.
2

Data Logger Installation

Certified logging equipment installed and secured on your switchboard.
3

Logging Period

Standard 7-day log, extended where a seasonal or variable load needs a longer window.
4

Data Retrieval & Analysis

Logged results compared against AS/NZS 3000 maximum demand tables.
5

Written Report

Clear findings and a recommendation you can act on or hand to a distributor.
6

Follow-on Upgrade Works

If the study shows an upgrade is genuinely needed, HDE can scope and deliver it directly.
High Demand Electrical service truck at a residential job site
New Electrical Connections

Why High Demand Electrical

High Demand Electrical is a Level 2 ASP accredited electrical contractor (EC Licence 397193C), certified to the ISO 9001, ISO 45001 and ISO 14001 standards. We install the data logger, run the analysis against AS/NZS 3000, and hand over a clear written report — and if the result points to a supply, switchboard or three-phase upgrade, the same team can scope and deliver that work directly.

We service homes and businesses across Sydney, and every study starts with a proper site assessment rather than a one-size-fits-all quote, since what's actually worth logging and for how long depends entirely on the property and what triggered the request.
Frequently Asked Questions

FAQs

What is power logging and why would I need it?

Power logging installs a data logger on your switchboard to record actual current, voltage and demand over a set period, usually a week. It replaces guesswork with real measured data, most often before a supply upgrade, EV charger installation, or when a distributor or compliance report requires evidence of actual load.

What's the difference between power logging and a maximum demand study?

Power logging is the raw data collection — installing the logger and recording load over time. A maximum demand study is the analysis that follows: comparing the logged (or calculated) demand against AS/NZS 3000's maximum demand tables to determine whether existing supply capacity is adequate or an upgrade is genuinely needed.

How long does a power logging study take?

A standard residential or small commercial log runs for about 7 days to capture a full weekly cycle, including any weekend load pattern. Larger commercial or seasonal sites sometimes need an extended log of several weeks to capture genuine peak demand periods.

Do I need a maximum demand study before a power supply upgrade?

It's strongly recommended. Upgrading supply capacity without first confirming actual demand risks either under-sizing the new supply or paying for more capacity than the site will ever use. A maximum demand study gives the load assessment behind any upgrade quote a solid, measured basis.

Can a maximum demand study help with a distributor dispute or defect notice?

Yes. Logged data is often the clearest way to demonstrate actual load to a network distributor, whether you're disputing a capacity assessment, responding to a defect notice, or supporting a connection application with real evidence instead of theoretical calculations alone.

Want To Know Your Actual Maximum Demand?

Every study starts with a proper site assessment before we confirm scope or pricing — what's worth logging, and for how long, depends on the property and what triggered the request.
Get A Quote
Bucket truck

Our Partners

Powering Your Needs with Expertise

If you’re looking for a reliable, experienced, and prompt electrician, look no further than High Demand Electrical. We cater to all your electrical needs, from routine maintenance to emergency repairs and complete system installations. Our skilled team is committed to providing professional service that ensures your electrical systems run smoothly. Whether it's a small task or a large project, give us a call today. Let us meet all your electrical demands with the quality and reliability you deserve.